A solar-powered SCADA site can have adequate battery capacity on paper and still lose communications during a winter storm. The problem may be an undersized array, an uncounted heater load, a radio transmission that pulls the DC bus below its operating limit, or a battery protection shutdown that the charge controller cannot automatically recover from.
For remote oil and gas monitoring, reliable power requires more than matching battery amp-hours to an RTU datasheet. The design must account for daily energy consumption, peak current, seasonal solar production, temperature-dependent charging limits, and system behavior as stored energy runs low.
Here at Dragonfly Energy, we help you meet your requirements to maintain power system service between site visits, even in the harshest environments. Here are considerations our engineers work with to properly size and build reliable solar power systems for remote locations.
Table of Contents
- Where Solar-Powered SCADA and Battery Backup Fit in Oil and Gas
- Start With the Daily RTU Power Budget
- Designing SCADA Batteries for Autonomy at End of Service Life
- Size the Solar Array for Winter Demand and Battery Recovery
- Include Cold-Weather Charging and Heater Energy
- Verify the DC Bus Across Its Full Operating Range
- Coordinate BMS Protection, Load Shedding, and Restart
- Choose LiFePO4 or Lead-Acid Based on the Operating Profile
- Monitor the Conditions That Precede a Power Failure
- Review Hazardous-Location and Environmental Requirements
- Specify a Battery System Around the Site's Requirements
- FAQs About Solar-Powered SCADA and RTU Battery Backup
Where Solar-Powered SCADA and Battery Backup Fit in Oil and Gas
Battle Born Batteries and Dragonfly Energy support remote industrial power applications that include pipeline monitoring, wellhead instrumentation, tank-level measurement, valve-status monitoring, and communications infrastructure. Across these applications, oil and gas SCADA power systems must maintain instrumentation, controls, and data transmission through changing loads, limited charging windows, and difficult environmental conditions.
A pipeline SCADA power supply, for example, may serve an RTU, pressure transmitters, valve-position inputs, and a radio or cellular modem. At a tank battery or wellsite, a remote telemetry power supply may support level sensors, flow measurement, and equipment-status reporting. The battery powers the field electronics needed to measure conditions and communicate with operators; powering valve actuators, pumps, or other process equipment introduces separate load requirements.
In a solar-powered RTU installation, the array supplies energy through a solar charge controller to the battery and DC distribution system. Stored energy supports nighttime operation and periods when solar output falls below demand. Depending on the equipment’s input requirements, loads operate directly from the battery bus or through regulated DC-DC converters. This makes the battery an active part of daily operation, as well as the reserve for extended low-sun conditions.
At sites with an existing utility, generator, or other primary supply, SCADA battery backup serves a different role. A SCADA UPS maintains power during supply interruptions, while RTU battery backup may protect a smaller group of field devices and their communications equipment. Solar, storage, and supplemental charging can also operate together where seasonal conditions make solar-only operation impractical.
Whether specified as industrial solar battery backup or remote monitoring battery backup, the engineering requirement is the same: deliver usable energy at the required voltage, support transient loads, and recover predictably after an interruption. Selecting the battery starts with quantifying those demands.

Start With the Daily RTU Power Budget
Calculate energy consumption at the battery terminals. Include the RTU or PLC, instrument loops, communications equipment, DC-DC converters, charge-controller standby consumption, monitoring hardware, and thermal management.
For each operating state:
Daily energy (Wh) = power (W) × operating time (h/day)
For radios and cellular modems, distinguish idle, receive, transmit, and network-reconnection states. A duty cycle based only on normal reporting intervals may miss extended transmissions or repeated connection attempts during poor coverage. Instrument excitation and warm-up time also belong in the budget when sensors are switched between measurements.
Measure a representative operating cycle where possible. Nameplate maximums help establish electrical ratings, but they may poorly represent daily energy use. Conversely, an average-power measurement can conceal a short transient that causes an RTU reset.
Example: A Hypothetical 24V Remote Telemetry Site
The following values illustrate the calculation method; they are not ratings for a particular installation or battery.
|
Load |
Assumed operation |
Daily energy |
|
RTU and I/O |
4 W continuously |
96 Wh |
|
Instruments and loop supplies |
3 W continuously |
72 Wh |
|
Communications equipment |
2 W for 23 hours; 14 W transmitting for 1 hour |
60 Wh |
|
Total equipment demand |
228 Wh |
Assume these loads operate through conversion equipment with a weighted efficiency of 90%, plus an additional 1 W of continuous battery-side consumption not included in that efficiency figure:
Daily battery energy = 228 ÷ 0.90 + (1 × 24) ≈ 277 Wh/day
The system averages approximately 11.5 W at the battery, before heating. Its equipment demand during transmission is 21 W, before conversion losses and any startup surge. Battery, converter, wiring, and protection ratings must support those higher instantaneous loads.
Include valve actuation, pump operation, and other intermittent high-power functions in the load calculation when they are part of the system. Document their running current and startup or surge requirements to verify that the battery system can supply the maximum simultaneous demand without exceeding its discharge limits.

Designing SCADA Batteries for Autonomy at End of Service Life
We specify autonomy as the required operating time without useful charging. Base the target on weather exposure, allowable downtime, access restrictions, and available supplemental power.
A preliminary energy-based sizing equation is:
Nominal battery energy = daily battery energy × autonomy days ÷ (usable capacity fraction × temperature capacity factor × end-of-life capacity factor)
The factors must come from the selected battery's operating limits, performance data, and project requirements. They are not universal values for either lithium or lead-acid batteries. Conversion losses already included in the daily battery energy should not be counted again.
For the example site, assume:
-
Five days without useful solar input.
-
An 80% usable capacity window. (20% buffer capacity)
-
A temperature capacity factor of 0.90.
-
An end-of-life capacity factor of 0.80.
Required nominal energy = 277 × 5 ÷ (0.80 × 0.90 × 0.80) ≈ 2,405 Wh
At an assumed nominal bank voltage of 25.6 V, that is approximately 94 Ah. A 100Ah bank would therefore be a candidate for further evaluation under these assumptions, before adding heater demand, growth allowance, or other project margins.
Size the Solar Array for Winter Demand and Battery Recovery
An array that meets average daily consumption may have little capacity left to recharge the battery after several low-sun days. Specify a recovery window as well as an autonomy target.
For a preliminary calculation:
Array power (W) = [daily battery energy + recovery energy per day] ÷ [design peak-sun-hours × net solar delivery factor]
Peak-sun-hours represent equivalent full-irradiance hours, not daylight duration. Use site-specific irradiation for the intended array orientation and critical season. Define the delivery factor to account for the relevant array, wiring, controller, and storage losses without counting the same losses twice.
Suppose the example site has accumulated a five-day energy deficit of 1,385 Wh. To replace that energy over three qualifying solar days while continuing to operate:
Daily energy requirement = 277 + (1,385 ÷ 3) ≈ 739 Wh/day
With an assumed 2.0 peak-sun-hours and a 0.75 net delivery factor:
Required array power = 739wh ÷ (2.0h × 0.75) ≈ 493 W
By comparison, offsetting the daily load alone would require approximately 185 W under the same assumptions. The difference is recharge capacity.
This is an energy-balance illustration, not a final array specification. Validate the design against weather sequences, shading, snow coverage, charge-current limits, and actual hours when the battery can accept charge. A monthly average cannot establish the probability of surviving consecutive poor-weather days.
Generally, sizing for winter will provide plenty of power in summer, but if panels need to be vertical for snow shedding, then the summer delivery factor may be much lower than expected and will need to be evaluated as well.
Also verify controller input-voltage limits against cold-weather array open-circuit voltage, and confirm adequate charging voltage at high module temperatures. Where the required availability cannot be met practically with solar and storage, evaluate supplemental charging from a fuel cell, generator, or available utility supply.

Include Cold-Weather Charging and Heater Energy
Treat discharge capability, available capacity, and permission to charge as separate temperature-dependent characteristics. A battery that can discharge at the site's minimum temperature may not be permitted to recharge at that temperature.
Use the selected battery manufacturer's documented charging limits and temperature-sensing requirements. Do not assume that reducing current makes subfreezing charging acceptable for a standard LiFePO4 battery. Any specialized low-temperature charging capability must be supported for the exact model and operating conditions.
For heated batteries or enclosures, include both initial warm-up energy and ongoing heat loss. Determine whether the heater is powered from stored energy, incoming charging power, or another supply; that choice affects both autonomy and recharge calculations.
For illustration, an assumed 24 W heater operating at a 25% average duty cycle consumes:
Heater energy = 24 × 0.25 × 24 = 144 Wh/day
If supplied by the battery, this increases the example site's daily demand from 277 to 421 Wh, approximately 52%. With the same autonomy and derating assumptions, required nominal storage increases to approximately 3.65 kWh, or 143 Ah at 25.6 V. The solar recovery calculation must also be updated.
The 25% duty cycle is an assumption, not a cold-weather performance claim. Determine actual heater demand from thermal analysis or testing at the design ambient temperature, including enclosure insulation, wind exposure, and the required internal temperature.
Check the cold-start sequence as well. If the heater requires incoming solar power, how much of a short winter charging window is consumed warming the battery before charging begins? If it draws from the battery, what reserve remains after an extended low-sun period?
*Battle Born offers Low Temp BMS configuration for industrial systems that are specified around much lower charge rates. These models are not sold as standard public products. Instead, Battle Born pre-qualifies the application before taking an order to confirm that the battery, charge rate, temperature range, and system design are appropriate for the project.
For cold-weather power systems, contact Battle Born’s Commercial Sales team to talk through your application.
Verify the DC Bus Across Its Full Operating Range
Check every connected device against the highest charging voltage, lowest intended operating voltage, and transient voltage at its terminals. Include voltage drop through cables, fuses, disconnects, and distribution hardware.
For a two-wire DC circuit:
Voltage drop = current × total outgoing-and-return circuit resistance
Evaluate that drop at the relevant peak current, not just the daily average. A transmission burst or valve operation may expose inadequate wiring or converter response even when the battery has substantial energy remaining.
A regulated DC-DC supply may be necessary where an instrument's acceptable input range is narrower than the battery bus range. Evaluate converter efficiency at the actual load, quiescent draw, startup current, dropout behavior, and electromagnetic compatibility with measurement and communications equipment.
For loop-powered instruments, verify the voltage budget at maximum loop current, including transmitter requirements, cable resistance, input resistance, and any barriers or isolators.
If the loads are DC, assess a DC supply architecture before introducing an inverter and AC power supplies. For installations using utility or generator power as the primary source, see our guide to industrial UPS battery backup. At a solar-only site, the battery supports routine nighttime operation as well as extended autonomy.
Coordinate BMS Protection, Load Shedding, and Restart
A battery management system protects the battery. Its protective disconnect should not be the normal endpoint of the site's energy-management strategy.
Define an operating sequence that provides warning and preserves critical functions before battery protection intervenes. Where the process permits, this could include an early low-energy alarm, disconnection of less essential loads, and an orderly shutdown before the battery reaches its protective limit.
Only shed loads or change reporting intervals when the site's control and safety requirements allow it. Designated safety functions and their power requirements must remain governed by the applicable system design.
Recovery deserves its own commissioning test. Verify:
-
Whether the charge controller starts with a battery in protective shutdown.
-
What conditions cause the BMS to reconnect charging and loads.
-
Whether the battery needs a manufacturer-specified wake-up procedure.
-
Whether simultaneous load restart causes another undervoltage event.
-
Whether reconnect thresholds and time delays prevent repeated cycling.
Test the complete sequence using the actual controller, battery, converters, and loads, following their approved procedures. A site that requires manual intervention after every deep discharge has an unresolved remote-service requirement.
Choose LiFePO4 or Lead-Acid Based on the Operating Profile
Battery comparisons should use deliverable energy under the specified conditions, not equal nameplate amp-hours.
LiFePO4 batteries have become an excellent option where daily cycling, limited enclosure space, and costly access make usable capacity and replacement frequency important. Its relatively flat discharge-voltage curve also means terminal voltage alone provides limited state-of-charge resolution through much of the operating range; use suitable battery monitoring rather than treating voltage as a fuel gauge.
Lead-acid batteries, which have been the primary choice in the past, remain viable when their charging behavior and established maintenance arrangements fit the project. However, review the selected product's cycle-life data, temperature effects, recharge requirements, and ventilation provisions to ensure their lower cost is valuable long-term. Persistent partial charging and inadequate time for recharge deserve particular attention in solar applications, causing quicker deterioration.

For either chemistry, compare service life at the expected temperature and cycling profile. A general cycle-life claim does not establish replacement intervals for a hot enclosure or a lightly cycled standby installation.
When replacing lead-acid with lithium, review the charger settings, equalization function, temperature compensation, disconnect thresholds, and permitted bank configuration against the lithium battery manufacturer's instructions. Mechanical fit does not establish electrical compatibility.
Monitor the Conditions That Precede a Power Failure
Specify telemetry that helps distinguish excessive demand from inadequate charging or unavailable battery capacity. Useful measurements include battery voltage and current, state of charge from a suitable monitor, battery temperature, daily solar yield, load energy, and available charge-inhibit or BMS fault status.
Trend the relationship between generation and consumption. Repeated daily deficits can identify a developing autonomy problem before an undervoltage alarm occurs. Temperature and charge-inhibit data can help distinguish a cold battery that cannot accept charge from an array that is not producing energy.
Confirm how those measurements reach the RTU. A local Bluetooth display does not by itself provide SCADA integration. Verify the available communications interface, protocol, alarm outputs, and access to the required data points.
Design alarms with enough energy reserve to transmit them, and configure central monitoring to recognize a missing heartbeat if the remote site loses power entirely.
Review Hazardous-Location and Environmental Requirements
Where equipment is installed in a classified location, verify the exact model's approval, applicable gas groups, temperature marking, ambient range, and installation conditions against the site's classification.
A certified battery does not automatically qualify the complete solar power assembly. Review the controller, converters, protection devices, enclosure, terminals, wiring methods, and interconnections as part of the installation.
Battle Born offers C1D2-certified lithium battery options for industrial applications. Our guide to Class I Division 2 batteries explains the selection considerations. Confirm suitability for the specific project with the responsible engineering team and current product documentation.

Also address condensation, corrosion, cable entries, solar heat gain, grounding and bonding, and surge exposure on PV, antenna, and instrument circuits. Battery capacity cannot compensate for a failed connection or damaged power interface.
Specify a Battery System Around the Site's Requirements
For a new solar-powered SCADA installation or a lead-acid retrofit, prepare a power specification with the measured load profile, peak current, device input-voltage limits, autonomy target, recharge window, temperature range, site classification, and required monitoring interfaces.
Include enclosure constraints and the required recovery behavior after low-voltage or temperature-related shutdown. Those details allow battery selection to address the actual integration problem.
Battle Born and Dragonfly Energy's oil and gas team support battery selection and power-system integration for remote industrial applications. Bring the site power specification to the team to evaluate LiFePO4 capacity, thermal requirements, charging compatibility, and applicable certified options before selecting a battery bank.
FAQs About Solar-Powered SCADA and RTU Battery Backup
Q: Can SCADA systems run on solar power?
Yes, many remote SCADA systems can run on solar power when the solar array, battery bank, and charge controller are sized for the site’s load, climate, and autonomy requirements. The system must produce enough energy during available sunlight and store enough energy for night, cloudy weather, storms, and seasonal low-sun periods.
Q: What is SCADA battery backup?
SCADA battery backup keeps monitoring, control, and communication equipment running when the primary power source is unavailable or inconsistent. It may support RTUs, PLCs, transmitters, radios, modems, sensors, and other field devices.
Q: What size battery do I need for a remote RTU?
The right battery size depends on the RTU load, connected sensors, communications equipment, duty cycle, required autonomy, temperature range, and charging source. Start by calculating total daily watt-hours, then size the battery bank for the required number of backup days.
Q: Is LiFePO4 better than lead-acid for remote SCADA?
LiFePO4 batteries can offer longer cycle life, more usable capacity, faster charging, lower maintenance, and more stable voltage than lead-acid batteries. For remote SCADA sites, those benefits can reduce replacement frequency and service calls. However, the system must be designed with the correct charge settings, temperature protections, and site requirements.
Q: What is a SCADA UPS?
A SCADA UPS is an uninterruptible power supply that keeps SCADA-related equipment online during power interruptions. It may be used at sites with grid power, generator power, or another primary source that needs backup protection.
Q: What is the difference between SCADA UPS and solar-powered SCADA?
A SCADA UPS typically provides backup power when a primary source fails. A solar-powered SCADA system may use solar as the primary power source, with batteries storing energy for night and low-sun periods. Some systems combine both approaches in a hybrid design.
Q: Can lithium batteries be used in oil and gas hazardous locations?
Lithium batteries can be used in oil and gas applications when the battery, enclosure, wiring, and system design are appropriate for the site. In classified areas, C1D2 certification and qualified engineering review may be required.
Q: Why do remote SCADA batteries fail in cold weather?
Cold temperatures reduce battery performance and can create connection, charging, and enclosure challenges. Lead-acid batteries often lose usable capacity in the cold, while LiFePO4 batteries require proper low-temperature charging protection or heating. Cold-weather SCADA systems should be designed around the lowest expected temperatures, not just average conditions.
Q: What are common oil and gas applications for solar-powered RTU battery backup?
Common applications include pipeline pressure monitoring, remote valve stations, wellhead monitoring, tank level monitoring, flow measurement, gas detection, vapor recovery equipment, cathodic protection monitoring, site security, and remote communications.
Q: How many days of battery autonomy does a remote RTU need?
There is no single value for every site. Establish autonomy from weather exposure, service access, required availability, and supplemental power. Evaluate the weather sequence and battery recovery period together; surviving one storm does not ensure adequate reserve for the next.
Q: Can I reuse an existing solar controller when switching to lithium?
Possibly, if the existing solar controller's charging settings, temperature controls, voltage and current ratings, and shutdown/restart behavior meet the selected battery's requirements. Confirm compatibility using both manufacturers' documentation and test the integrated system.
Q: Why can an RTU reset when the battery still has capacity?
A reset can result from voltage drop, a transmission or startup transient, converter current limiting, or a protective disconnect. Record voltage at the affected device during the event and compare it with battery-terminal voltage to help locate the problem.
Q: Does a larger battery fix inadequate winter solar production?
A larger battery extends the time before an energy deficit causes shutdown. It does not correct a sustained shortfall in generation. The design must also provide enough charging energy to support the load and restore the required reserve.